Skip to content

Apollo Institute of Medical Sciences Chittoor vs Gokaraju Rangaraju Institute of Engineering and Technology

Compare fees, EAPCET cutoffs, placements, and other key metrics side-by-side.

Feature
AIOM
Apollo Institute of Medical Sc...
GRRR
Gokaraju Rangaraju Institute o...
BASIC INFORMATION
TypePrivatePrivate
LocationChittoor, Andhra PradeshHyderabad, Telangana
AffiliationYSRUHSJNTUH
Established20001997
NAAC Accreditation-A++
NBA AccreditationNoYes
NIRF Rank175
FEE STRUCTURE (ANNUAL)
Annual Fee₹15,00,000₹1,60,500
4-Year Total₹60,00,000₹6,42,000
EAPCET CUTOFFS (2024-25) — Lower Rank is Better
cse6,779
ece8,500
eee16,500
mech28,436
civil33,985
PLACEMENTS
Avg Package (LPA)₹6
Highest Package (L)₹30L
Companies Recruiting120+

AIOM — Summary

  • MBBS

GRRR — Summary

  • Lower annual fee (₹1,60,500)
  • Higher average placement (₹6 LPA)
  • NAAC Grade A++
  • NBA accredited programs
  • CSE, ECE, EEE, MECH and more

Comparison Summary

Apollo Institute of Medical Sciences Chittoor (AIOM) and Gokaraju Rangaraju Institute of Engineering and Technology (GRRR) are both prominent engineering colleges in Chittoor and Hyderabad. GRRR offers a more affordable option at ₹1,60,500 annually, compared to ₹15,00,000.Consider your priorities regarding fees, placements, and academic rankings when making your choice.

Frequently Asked Questions

Which is better: Apollo Institute of Medical Sciences Chittoor or Gokaraju Rangaraju Institute of Engineering and Technology?+

On balance, Gokaraju Rangaraju Institute of Engineering and Technology (GRRR) edges out Apollo Institute of Medical Sciences Chittoor (AIOM) on most measurable signals: it has a higher NAAC grade (A++ vs -). That said, the right choice depends on your branch preference, fee budget, and city/campus fit — not just headline numbers.

What is the fee difference between AIOM and GRRR?+

Apollo Institute of Medical Sciences Chittoor charges ₹15,00,000 per year and Gokaraju Rangaraju Institute of Engineering and Technology charges ₹1,60,500 per year. Over the four-year B.Tech programme, GRRR works out to ₹6.42 lakh total versus ₹60.00 lakh at AIOM — a difference of ₹53.58 lakh. These figures are convenor-quota tuition fees and exclude special fees, hostel and management-quota premiums.

Is AIOM or GRRR better accredited?+

Apollo Institute of Medical Sciences Chittoor holds NAAC not accredited; Gokaraju Rangaraju Institute of Engineering and Technology holds NAAC A++. AIOM is not NBA accredited; GRRR is NBA accredited. On NIRF, AIOM ranks unranked and GRRR ranks #175. Accreditation matters for campus recruiting and credit transfer — A+ and above is the practical threshold most top recruiters look for.

Where are AIOM and GRRR located, and how are they affiliated?+

Apollo Institute of Medical Sciences Chittoor is in Chittoor, Andhra Pradesh (affiliated to YSRUHS, established 2000); Gokaraju Rangaraju Institute of Engineering and Technology is in Hyderabad, Telangana (affiliated to JNTUH, established 1997). The two are in different states, which affects EAPCET counselling eligibility — AP and TG run separate counselling processes.